Dash360 Risk manages project risk in the same platform as your estimate, budget, and schedule: no separate risk tool, no re-keying, no reconciling spreadsheets. Every risk you log is tied to your WBS, work packages, and activities, so risk analysis reads from the same numbers your project already runs on.
- Lite gives every team a structured, quantified risk register with a full cost Monte Carlo that prices your mitigation plan, not just a red/amber/green grid.
- Pro adds the rest of the quantitative engine: estimating uncertainty as well as risk events, the schedule as well as the cost, correlation, contingency decomposition, and trend analytics over time.
Risk analysis that lives inside your cost and schedule.
Start with a quantified register in Lite,
scale to full cost and schedule Monte Carlo in Pro.
Start with a quantified register in Lite,
scale to full cost and schedule Monte Carlo in Pro.
Start with Lite. Upgrade when you’re ready to quantify.
Every risk you log in Lite — including the schedule and cost-impact detail — carries straight into Pro. Upgrading unlocks the analytics; it never asks you to re-enter your data.
Lite vs Pro: At a Glance
- Lite
- Pro
| Capability | Lite | Pro |
| Capability | $1,000 /year | $5,000 /year |
| Risk Register (create/edit, threats & opportunities, handling strategies) | ||
| Risk mapped to WBS, work packages & activities | ||
| Risk mapped to schedule activities | ||
| Probability × Impact heat maps (cost, schedule, overall ranking) | ||
| Configurable Risk / Mitigated Risk terminology | ||
| Response Actions (mitigation tracking) | ||
| Total Exposure summary (Risk vs Mitigated, cost & schedule) | ||
| Attachments, Risk Review, and custom fields | ||
| Import and export of risks | ||
| Risk Quality Check Report | ||
| Cost Monte Carlo — Risk Events Only (S-curve + percentiles) | ||
| Risk and Mitigated Risk curves, with Reduction and % Improved | ||
| Percentile summary, custom percentiles, reproducible random seed | ||
| Save, reload and rename simulations | ||
| Scenario Planner | ||
| Simulation modes: Combined and Uncertainty Only | ||
| Cost & Schedule Uncertainty cascade | ||
| Schedule Monte Carlo (project finish-date distribution) | ||
| Schedule contingency decomposition | ||
| Monte Carlo by WBS | ||
| Sensitivity: risk, activity and cost-structure tornadoes | ||
| Per-node Monte Carlo drill-down | ||
| Compare Simulations | ||
| Delta Analysis (Risk → Mitigated movement) | ||
| Risk Analytics Burndown (nine charts) | ||
| Correlation (risk-to-risk and activity-to-activity) | Contact Us | Contact Us |
What Every Tier Gets
Lite is a real product, not a teaser. It is a complete risk-management workflow on its own.
- A structured register: Log threats and opportunities, assign a handling strategy (Mitigate, Transfer, Accept, Avoid, Exploit, Enhance, Share), owner, and status, with every risk tied to the WBS and work packages it affects.
- A real simulation, not a single number: Lite runs a full 5,000-iteration Monte Carlo over your risk events, sampling each risk against its probability and impact distribution. You get an S-curve, a frequency histogram, and a percentile summary (P10 through P90)..
- It prices your mitigation plan: This is the part most tools make you pay extra for. Lite plots the Risk and Mitigated Risk curves together and quantifies the gap: on our demo project, exposure at P80 falls from $13.1M to $7.5M, a $5.6M reduction and a 43% improvement. That is a defensible answer to “what is our risk response actually buying us?”
- Reproducible results: Set a random seed and the same run returns the same numbers, which matters when a review board asks where a figure came from.
- Scenario planning: Model different combinations of response actions and compare the outcome.
- Data quality built in: The Risk Quality Check Report flags incomplete risks field by field, so the register stays trustworthy.
What Pro Unlocks
Pro turns the register into a full quantitative risk analysis environment. Each section below maps to a feature that is either grayed out with an upgrade prompt or hidden entirely in Lite.
1. Estimating uncertainty, not just risk events
What it is: Lite answers “what could these risks cost us?” Pro also answers “how wrong could our estimate be, even if nothing on the risk register happens?” The Cost & Schedule Uncertainty cascade captures how much each WBS element, work package, activity, and resource assignment could move on its own, and any level can carry its own uncertainty class and cascade it down.
Why it matters: A simulation driven only by discrete risk events tells an incomplete story. Pro lets you run Risk Events Only, Uncertainty Only, or Combined, and Combined is the one most programs actually need.
Who it’s for: Estimators and cost analysts who need defensible contingency at a stated confidence level.
2. The schedule, not just the cost
What it is: Pro simulates activity durations through the network and produces a project finish-date distribution, with a contingency decomposition splitting the result between duration uncertainty, risk events, and their interaction.
Why it matters: The question becomes when, not only how much, and the mitigation argument works the same way in days as it does in dollars.
Who it’s for: Schedulers and PMs quantifying schedule confidence and defending a baseline.
3. Where the risk concentrates
What it is: Monte Carlo by WBS allocates a project-level number down the hierarchy. The sensitivity tornadoes rank which risks, which activities, and which cost structures move the outcome most. Per-node drill-down opens the cost and schedule distribution for any single node of the cascade.
Why it matters: Turns one project-level figure into an auditable, allocable story, which is what stage-gate and government-contract reviews ask for.
Who it’s for: PMs allocating contingency and briefing stakeholders.
4. Correlation
What it is: Related risks rarely move independently. Pro lets you correlate risk to risk and activity to activity, so the simulation stops treating a common-cause group as a set of coin flips.
Why it matters: Uncorrelated sampling systematically understates the tail. Correlation is what makes a P80 defensible when several risks share a root cause.
Who it’s for: Anyone whose reviewers know to ask about it.
5. Delta Analysis and Compare Simulations
What it is: Delta Analysis quantifies the movement from the gross Risk position to the Mitigated position across the whole register. Compare Simulations puts saved runs side by side.
Why it matters: Proves mitigation value in aggregate, and lets you show this month against last month rather than eyeballing two charts.
Who it’s for: Anyone who has to justify their numbers or needs to compare this month’s monte carlo to previous cycles.
6. Risk Analytics Burndown — exposure over time
What it is: Nine charts tracking the risk profile over time: exposure over time, risk count trend, exposure velocity, opened versus closed, cash-flow timing, exposure by WBS level, exposure by risk ID, activity drivers, and risk drivers.
Why it matters: Turns risk from a point-in-time snapshot into a managed trend you can report on, and answers whether the program is genuinely burning risk down or just carrying it.
Who it’s for: PMs and program controls reporting monthly.
The fields that power it (editable in Lite, activated in Pro)
Add/Edit Risk exposes the fields the Pro analytics consume: Start Date, Finish Date, Add Activities, and the Probability and Cost Impact distributions. In Lite these carry a small PRO badge and stay fully editable. Fill them in now and the analytics that read them light up the day you upgrade.
Start with Lite & Upgrade when you are ready to quantify
Every risk you log in Lite, including the schedule and cost-impact detail, carries straight into Pro. Upgrading unlocks the analytics; it never asks you to re-enter your data.